Civil Contractor, Developer & Commercial Builders Soil Erosion & Sediment Control Products
Soil Erosion & Sediment Control Products:
Printed Silt Fence:
Green or black cloth printed with your company name, logo and details, trenched and backfilled, stapled to timber pickets @ 2.0m centres. more
Standard Silt Fence:
Plain green or black cloth, trenched & backfilled, stapled to timber pickets @ 2.0m centres. more
Heavy Duty Silt Fence:
Plain green cloth, trenched & backfilled, ring clipped to 2 strands of wire with star pickets @ 2.0m centres.
Visual Barrier Fence:
Plastic barrier mesh 1m (orange), ring clipped to 2 strands of 8 gauge wire with 1.65m star pickets (including safety caps) @ 5.0m centres. more
Silt & Safety Fence:
Plastic barrier mesh 1m (orange), ring clipped to 2 strands of tensioned gauge wire with 1.65m star pickets (including safety caps) @ 5.0m centres.
Dust Fence:
Shade Cloth - 2.4m star pickets @ 3.0m centres, 4 strands of tensioned wire with shade cloth, ring clipped & speed braced at pickets more
Tree Protection Fencing :
Used to visualise the “No Go Zone” areas for which trees must be protected when clearing is required. Can be customised to incorporate specific requirements specified by the engineers.
Chain Wire Fencing :
We can cater to all types of chain wire fencing requirements
Sediment Socks are Available
We can offer:
supply only, supply and fill or , supply, fill & place on-site
To help minimise soil erosion and control sediment discharge into our waters pHence it offer Gold Coast, Brisbane, Sunshine Coast and Northern NSW Civil Contractor, Developers and Commercial Builder various products to comply with industry requirements.
As a Civil Contractor, Developer or Commercial Builder start your next project right with pHence it's Fencing Products. Offering sediment and safety control via standard silt fences, printed silt fences, safety fences, dust fences and our cost effective printed shade cloth advertising solutions you are able to control soil, dust and erosion anywhere and at any job.
Erosion and sediment control measures are to be implemented across the site; while sediment control is to be located at all points where stormwater can enter constructed stormwater inlet pipes or leave the activity site.
Failure to comply with these requirements may result in failed building inspections, which means time delays with the inspection process and additional costs as a result of follow-up visits from compliance officers and building inspectors
Local council regularly inspects erosion and sediment control measures of building sites. These measures are to be maintained at all times. Failure to carry out adequate erosion and sediment control on your building site may result in action being taken under the relevant legislation.




